Friday 2 July 2010

Moving up. July 2010

July arrived and most people were thinking of their summer holidays, the builders however were making the most of good weather and moving up the building almost to roof level. The main walls were completed and signs of interior infrastructure appeared. The vision of the Architect came into reality for the first time as rooms started to be recognisable.
The balcony framework is slotted into place

Almost at roof level the work continues with an alarming lack of safety equipment